Questions that come up before a bay plan
Most of what we get asked sits in the same handful of places: how to measure a run properly, which finish suits the room, what the load rating actually covers, and what happens after you send a sketch. Below are straight answers to those, without the sales padding. If your situation is unusual, the notes you send with a photo usually settle it faster than a long back-and-forth.
What do I need to measure before ordering?
Wall length is the starting point, but it is rarely the whole story. Record the available depth from the wall to the nearest obstruction, ceiling height, and anything that interrupts the run: door swings, drain covers, pipework, sockets and extractor ducting. For a galley, note the clear walkway width you want to keep, because that decides the maximum shelf depth. A rough sketch with upright positions and shelf heights marked is enough to work from.
Stainless steel or epoxy coated?
Stainless steel suits wet zones, steam and areas that get washed down often, which is why it usually ends up near the pass or in a butcher's room. Epoxy coated shelving holds up well in ambient dry stores and costs less per bay, but a chipped coating over a wet floor is where rust begins. Mixed fit-outs are common: stainless in the wet areas, epoxy in the dry store, kept to the same upright gauge so bays can be extended later.
How should I read the load rating?
Ratings are stated per bay and generally assume weight spread evenly across the shelf. Kitchens rarely load that way. A dense stack of tins in one corner deflects a shelf more than the same weight distributed along its length, so upright gauge, wire thickness and the number of support brackets all matter. If a shelf is close to its limit, add a mid-level support or shorten the span rather than pushing the figure.
What comes back after I send measurements?
The team works from a photo and a rough sketch, then ships a cut list with assembly notes. That document lists upright lengths, shelf counts and spacing, plus the brackets, wall channels, corner gussets and castor kits the run needs. Check the upright length against your measured ceiling height before drilling, and confirm the fixing type if a bay sits against an insulated cold room panel, where standard wall plugs will not hold.
Do cold rooms need a different specification?
Yes, mainly around moisture and airflow. Surfaces stay wet for much of the day, so any bare edge or drilled hole becomes a starting point for corrosion. Bays should sit clear of the floor on feet or castors so water drains and cleaning reaches underneath, and shelves should not block the return air path. In a tight room, cantilever brackets on a wall channel free up floor space, provided the channel fixings suit the panel thickness.
Trade orders and single bays
Trade pricing is available for fit-out crews running multiple bays across a site, and single-bay orders are fine for small kitchens that just need one run sorted. Both go through the same measurement step. Castor kits are worth specifying where a bay has to move between storage and prep, but check the loaded weight against the castor rating and the floor itself, since uneven concrete and drainage channels change how a full bay rolls.
More background on materials and finishes sits in the
resources section,
and you can reach the team through the
contact page.